Utility infrastructure construction programme in the territory of the City of Bijeljina

Assembly of the City of Bijeljina adopted Conclusion number: 01-013-40-2/20 on the 40th session held on 12 October 2020. This Conclusion established the draft Decision on the budget of the City of Bijeljina for 2021. In accordance with the draft budget of the City of Bijeljina for 2021, an amount of BAM 2,490,000.00 was planned for utility infrastructure construction, within the consumption item 0005170 of the Department of Residential Affairs, Utilities and Environmental Protection.
 
The funds were planned according to the following budget items:
 
  • economic code 511100-17: Utility infrastructure construction (road network, water supply network, electricity grid, gas distribution pipeline, Directorate for construction and development, supervision, planning, budget, co-funding) in the amount of BAM 2,400,000.00
  • economic code 511100-8: Cost of construction and purchase of utility infrastructure facilities – supervision, planning, Directorate for construction and development, in the amount of BAM 50,000.00
  • economic code 511100-9: Cost of construction and purchase of industrial zone facilities, supervision and planning, Directorate for construction and development, in the amount of BAM 40,000.00